Light Steel Structure Big Span Double Bay Metal Plant Steel Frame Workshop Prefab Steel Industrial Park with Solar Panel
The Light Steel Structure Big Span Double Bay Metal Plant Steel Frame Workshop is a prefab steel industrial park building designed for large-scale operations. Its robust frame supports solar panels, offering energy efficiency and durability for industrial use
Light Steel Structure Big Span Double Bay Metal Plant Steel Frame Workshop – Prefab Steel Industrial Park with Solar Panel
This prefabricated steel building is engineered for heavy-duty industrial applications, featuring a big span double bay design that maximizes usable space. The light steel structure ensures cost-effective construction without compromising strength, and the integrated solar panel capability supports sustainable energy goals.
Key Features
- Full customization to meet specific project requirements
- Project case studies available for reference
- Raw material identification and traceability for quality assurance
- Quality traceability throughout the manufacturing process
Product Specifications
- Structure: Light steel frame
- Span: Big span double bay
- Application: Metal plant, workshop, industrial park
- Optional: Solar panel integration
Product Specifications
| Material | Q235B / Q355B Steel |
| Span | 12m – 60m (Customizable) |
| Height | 6m – 12m |
| Roof Type | Single/Double Slope, Curved |
| Wall Panel | EPS/Rock Wool/PU Sandwich Panel |
| Design Life | 50 Years |
| Surface Treatment | Hot-dip Galvanized / Painted |
| Wind Load | 0.5 KN/m² (Customizable) |
| Snow Load | 0.3 KN/m² (Customizable) |
Key Features
- Large clear span design for maximum working space
- Fast construction – 30% faster than traditional buildings
- Cost-effective with 20-30% savings vs concrete structures
- Fully customizable dimensions and layout
- Fire-resistant and corrosion-resistant panels
- Free 3D design and engineering drawings included
Application Scenarios
- Manufacturing and assembly lines
- Heavy machinery workshops
- Auto repair and maintenance shops
- Industrial processing facilities
Installation Process
- Foundation: Concrete foundation per our engineering drawings
- Steel Frame: Erect main portal frames and secondary members
- Roof System: Install purlins, roof panels and flashing
- Wall System: Mount wall panels, windows and doors
- Finishing: Gutters, downspouts, accessories and inspection
FAQ
Q: What is the delivery time?
A: 30-45 days after design confirmation, depending on project size.
Q: Do you provide installation guidance?
A: Yes, we provide detailed installation drawings, manuals, and remote video guidance. On-site engineers available for large projects.
Q: Can the warehouse be expanded later?
A: Yes, our modular design allows easy future expansion in length or width.
Q: What certifications do you have?
A: ISO 9001, CE, SGS certified. All materials meet international standards.
MAECENAS IACULIS
Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.
ADIPISCING CONVALLIS BULUM
- Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
- Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
- Diam parturient dictumst parturient scelerisque nibh lectus.
Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.

Reviews
There are no reviews yet.