Pre-engineered Prefabricated Large Span Steel Structure Building Cultural Museum Mall Hall Gym Sports Venues Leisure Facilities

Our pre-engineered prefabricated large span steel structure building is ideal for cultural museums, malls, gyms, sports venues, and leisure facilities. It offers full customization, material traceability, and proven project case studies for reliable quality

Product descriptions from the supplier

Our pre-engineered prefabricated large span steel structure building is designed for cultural museums, mall halls, gyms, sports venues, and leisure facilities. It offers full customization, project case studies, raw material identification and traceability, and quality traceability.

Key Features

  • Full customization
  • Project case studies
  • Raw material identification and traceability
  • Quality traceability

For support, visit our Help Center, live chat, check order status, refunds, or report abuse. Safe and easy payments available.

Product Specifications

Material Q235B / Q355B Steel
Span 30m – 100m+ (Large Clear Span)
Height 8m – 25m
Roof Structure Space Frame / Truss
Roofing Standing Seam Metal Roof / PTFE Membrane
Design Life 50 Years
Seismic Rating Grade 8
Snow Load 0.5 KN/m² (Customizable)

Key Features

  • Ultra-large clear span up to 100m+ without interior columns
  • Space frame roof for lightweight yet strong coverage
  • Excellent acoustics and ventilation design
  • Natural and artificial lighting optimization
  • Spectator seating integration available
  • Multi-purpose design for various sports activities

Application Scenarios

  • Indoor football and basketball courts
  • Swimming pools and aquatic centers
  • Multi-purpose sports complexes
  • School and university gymnasiums

Installation Process

  1. Foundation: Heavy-duty reinforced concrete foundation
  2. Main Structure: Erect steel columns and space frame/truss roof
  3. Roofing: Install roof panels or membrane system
  4. Cladding: Wall panels, glazing, entrance systems
  5. Interior: Sports flooring, seating, MEP, and finishing

FAQ

Q: What is the maximum span without columns?
A: We can achieve 100m+ clear span using space frame or truss structures.

Q: Can it be used for international competitions?
A: Yes, we design to meet FIBA, FIFA, and Olympic standards upon request.

Q: How long does construction take?
A: Typically 60-120 days depending on size and complexity.

Q: Do you handle the sports flooring too?
A: We focus on the building structure. We can recommend flooring partners or integrate if needed.

Reviews

There are no reviews yet.

Be the first to review “Pre-engineered Prefabricated Large Span Steel Structure Building Cultural Museum Mall Hall Gym Sports Venues Leisure Facilities”

Your email address will not be published. Required fields are marked *

MAECENAS IACULIS

Vestibulum curae torquent diam diam commodo parturient penatibus nunc dui adipiscing convallis bulum parturient suspendisse parturient a.Parturient in parturient scelerisque nibh lectus quam a natoque adipiscing a vestibulum hendrerit et pharetra fames nunc natoque dui.

ADIPISCING CONVALLIS BULUM

  • Vestibulum penatibus nunc dui adipiscing convallis bulum parturient suspendisse.
  • Abitur parturient praesent lectus quam a natoque adipiscing a vestibulum hendre.
  • Diam parturient dictumst parturient scelerisque nibh lectus.

Scelerisque adipiscing bibendum sem vestibulum et in a a a purus lectus faucibus lobortis tincidunt purus lectus nisl class eros.Condimentum a et ullamcorper dictumst mus et tristique elementum nam inceptos hac parturient scelerisque vestibulum amet elit ut volutpat.